Permit: TC-RES-0325-01599
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3221 N CHRISTMAS AV
Address NEW:
3221 N CHRISTMAS AV
Apply Date:
03/27/2025
Applicant:
TFS Solar
Description:
Roof mount 12.62 kW DC photovoltaic solar system; 29 modules. (2) 7.6 kW inverters with 2 branches each, 125A PV Subpanel. Interconnection via 80A meter socket adapter with integrated 80A breaker to 200A bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0325-01599
Permit Status: Complete
Permit Description: Roof mount 12.62 kW DC photovoltaic solar system; 29 modules. (2) 7.6 kW inverters with 2 branches each, 125A PV Subpanel. Interconnection via 80A meter socket adapter with integrated 80A breaker to 200A bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2025 | RESIDENTIAL SOLAR v.2 | 07/02/2025 | APPROVED |
| 03/27/2025 | RESIDENTIAL SOLAR v.1 | 04/25/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0325-01599
Permit Status: Complete
Permit Description: Roof mount 12.62 kW DC photovoltaic solar system; 29 modules. (2) 7.6 kW inverters with 2 branches each, 125A PV Subpanel. Interconnection via 80A meter socket adapter with integrated 80A breaker to 200A bus with 200A MCB.
| Date | Description | Comments |
|---|---|---|
| 04/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01599
Permit Description: Roof mount 12.62 kW DC photovoltaic solar system; 29 modules. (2) 7.6 kW inverters with 2 branches each, 125A PV Subpanel. Interconnection via 80A meter socket adapter with integrated 80A breaker to 200A bus with 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 09/04/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 09/04/2025 | RSBU - Building Final | Passed |