Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
136 W SIMPSON ST
Address NEW:
136 W SIMPSON ST
Apply Date:
03/25/2025
Applicant:
TFS Solar
Description:
27 kWh Storage addition to existing roof mounted PV system. 2 Tesla Powerwall-3 batteries. 200A bus with 175A MCB (de-rated from 200A), interconnection via PCS, Tesla Backup Switch for whole home backup. 14-50 NEMA rated outlet for EV charging with GFCI protection on 50A breaker.

Permit Reviews

Permit Number - TC-RES-0325-01512
Permit Status: Complete
Permit Description: 27 kWh Storage addition to existing roof mounted PV system. 2 Tesla Powerwall-3 batteries. 200A bus with 175A MCB (de-rated from 200A), interconnection via PCS, Tesla Backup Switch for whole home backup. 14-50 NEMA rated outlet for EV charging with GFCI protection on 50A breaker.
Start Date Submittal Complete Date Status  
03/25/2025 RESIDENTIAL SOLAR v.1 04/23/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0325-01512
Permit Description: 27 kWh Storage addition to existing roof mounted PV system. 2 Tesla Powerwall-3 batteries. 200A bus with 175A MCB (de-rated from 200A), interconnection via PCS, Tesla Backup Switch for whole home backup. 14-50 NEMA rated outlet for EV charging with GFCI protection on 50A breaker.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/02/2025 RSBU - Building Final Passed
07/02/2025 COT - RSOL - Electrical Final Solar Project Passed 7.2.25
Powerwalls are installed as per plan. All placards and labels present. Conduits are properly supported.
07/02/2025 BULD - Electrical Clearance Passed 7.2.25
Powerwalls are installed as per plan. All placards and labels present. Conduits are properly supported.