Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/11/2025
Applicant:
Paula Jaffe
Description:
ADU

Permit Reviews

Permit Number - TC-RES-0325-01294
Permit Status: Inspections complete
Permit Description: ADU
Start Date Submittal Complete Date Status  
01/07/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/08/2026 APPROVED Review Details
05/29/2025 RESTAMP - RESIDENTIAL v.1 06/02/2025 APPROVED Review Details
04/28/2025 RESIDENTIAL NEW DWELLING v.2 05/29/2025 APPROVED Review Details
03/18/2025 RESIDENTIAL NEW DWELLING v.1 04/17/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0325-01294
Permit Status: Inspections complete
Permit Description: ADU
Total Outstanding Activity Conditions - 1
Date Name
04/14/2025 Manual J report

Conditions

Permit Number - TC-RES-0325-01294
Permit Status: Inspections complete
Permit Description: ADU
Date Description Comments
04/14/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
03/18/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0325-01294
Permit Description: ADU
Total Completed Inspections - 15
Date Description Inspector Results Comments
07/11/2025 COT - RSPL - Rough Soil Passed
07/11/2025 COT - RSEL - Electrical Underground Passed
07/18/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 7.18.25
Footer depth verified
Ufer verified
Rebar verified per plans
Compaction good
Clearance from earth verified
Trench conditions acceptable
OK TO POUR
07/18/2025 COT - RSBU - Preslab and floodplain Passed 7.18.25
Footer depth verified
Ufer verified
Rebar verified per plans
Compaction good
Clearance from earth verified
Trench conditions acceptable
OK TO POUR
08/15/2025 COT - RSBU - Roof Nailing Passed
08/21/2025 COT - RSPL - Yard Water Line Passed
09/16/2025 BULD - Electrical Clearance Passed TEP CLEARANCE: ECO.
09/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/23/2025 COT - RSEL - Grounding/Bonding Passed
01/16/2026 COT - RSPL - Plumbing Final Passed
01/16/2026 COT - RSME - Mechanical Final Passed
01/16/2026 COT - RSEL - Outdoor Lighting Passed
01/16/2026 COT - RSEL - Electrical Final Passed
01/16/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
FINAL FEMA 2626 E TOWNER ST-2026-01-03_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
JAFFE_PROJECT_ADU_4.0_V1.PDF DOCUMENTS VIEW