Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2601 W CULPEPPER CT
Apply Date:
03/07/2025
Applicant:
Carlos Canez
Description:
Repair Fire Damage

Permit Reviews

Permit Number - TC-RES-0325-01216
Permit Status: Complete
Permit Description: Repair Fire Damage
Start Date Submittal Complete Date Status  
03/13/2025 RESIDENTIAL NEW DWELLING v.1 04/14/2025 APPROVED Review Details
04/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0325-01216
Permit Status: Complete
Permit Description: Repair Fire Damage
Date Description Comments
03/13/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/03/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0325-01216
Permit Description: Repair Fire Damage
Total Completed Inspections - 8
Date Description Inspector Results Comments
05/12/2025 COT - RSBU - Roof Nailing Passed 5-12-25, truss system verified per plans and roof nailing inspection approved. Okay to dry-in roof.
05/12/2025 BULD - Electrical Clearance Passed 5-12-25, panel okay to be energized. RECN clearance sent to TEP on meter #147557516.
05/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-12-25, intermediate inspection approved. Okay to continue with construction.
10/17/2025 COT - RSEL - Electrical Final Passed
10/17/2025 COT - RSME - Mechanical Final Passed
10/17/2025 RSBU - Building Final Passed
10/17/2025 RSBU - Building Progress Passed
10/17/2025 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
CULPEPPER LAYOUT_V1.PDF DOCUMENTS VIEW
R86788921.J2500271A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2601 W CULPEPPER CT PLAN SET_V1.PDF DOCUMENTS VIEW