Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0325-01131
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
244 S AVENIDA DEL PALO FIERRO
Address NEW:
244 S AVENIDA DEL PALO FIERRO
Apply Date:
03/03/2025
Applicant:
TFS Solar
Description:
Roof mount 4.35 kW DC photovoltaic solar system; 10 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 225A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-RES-0325-01131
Permit Status: Complete
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 225A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/03/2025 | RESIDENTIAL SOLAR v.1 | 04/01/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01131
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 225A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | BULD - Electrical Clearance | Passed | Approved solar with Tesla switch and powerwall 3 - DGC/DGL/BAT Clearance was called into TEP at 10am | |
| 05/27/2025 | COT - RSOL - Electrical Final Solar Project | Passed |