Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Fees Paid
Type:
Residential Building - One or Two Family
Apply Date:
03/27/2024
Applicant:
Solgen Power
Description:
Duplex with two addresses same dwelling, not detached.

Permit Reviews

Permit Number - TC-RES-0324-01797
Permit Status: Fees paid
Permit Description: Duplex with two addresses same dwelling, not detached.
Start Date Submittal Complete Date Status  
09/05/2024 RESIDENTIAL SOLAR v.1 09/19/2024 REQUIRES RESUBMIT Review Details
10/10/2024 RESIDENTIAL SOLAR v.2 10/17/2024 APPROVED Review Details
03/27/2024 RESIDENTIAL SOLAR v.1 04/09/2024 REQUIRES RESUBMIT Review Details
04/10/2024 RESIDENTIAL SOLAR v.2 04/10/2024 REQUIRES RESUBMIT Review Details
04/10/2024 RESIDENTIAL SOLAR v.3 04/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0324-01797
Permit Status: Fees paid
Permit Description: Duplex with two addresses same dwelling, not detached.
Total Outstanding Activity Conditions - 2
Date Name
10/24/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/24/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Fees Paid
Permit Number: TC-RES-0324-01797
Permit Description: Duplex with two addresses same dwelling, not detached.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/24/2024 BULD - Electrical Clearance Passed Approved with an existing line-side tap - DGC/DGL Clearance to TEP is required for the solar meter
10/24/2024 RSBU - Building Final Passed
10/24/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
ALMA MOLINA - 2423 - STRUCTURAL LETTER_V3.PDF DOCUMENTS VIEW
CONS-MOLINA UPDATED PLANS 2423_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW