Permit: TC-RES-0324-01703
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
886 W CUSHING ST
Address NEW:
886 W CUSHING ST
Apply Date:
03/21/2024
Applicant:
Adam Ortiz
Description:
Single Family Residence
Permit Reviews
Permit Number - TC-RES-0324-01703
Permit Status: Complete
Permit Description: Single Family Residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/25/2024 | RESIDENTIAL NEW DWELLING v.2 | 05/23/2024 | APPROVED |
| 03/22/2024 | RESIDENTIAL NEW DWELLING v.1 | 04/22/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0324-01703
Permit Status: Complete
Permit Description: Single Family Residence
| Date | Description | Comments |
|---|---|---|
| 04/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0324-01703
Permite Description: Single Family Residence
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2024 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | 1st lift at 8' all around okay to grout. 8/12/2024 1st lift at 8' interior walls okay to grout. 8/23/2024 11/12/24: 2nd lift passed ok to proceed. |
| 10/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Footings for site wall and gate walls. OK to place concrete in progress areas. |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Fire foam penetrations throughout and place tub on test |
| 12/23/2024 | COT - RSBU - Preslab | N/A | Partial Pass | Interior slab, reinforced with #4 wire mesh. Ok to place concrete in progress areas. |
| 12/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | 12/6/24: partial pass for roof nailing and and decking ok to proceed with drying-in |
| 12/10/2024 | RSPL - Plumbing Progress | N/A | Partial Pass | 12/10/24: plumbing underground at first floor kitchen, powder room and master bath passed. ok to backfill, 2nd floor system under test in in wall. pending tie in at 3” from first floor to second floor. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0324-01703
Permit Description: Single Family Residence
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2024 | COT - RSPL - Sewer | Passed | ||
| 05/22/2025 | COT - RSBU - Masonry Pregrout | Passed | ||
| 05/22/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/04/2025 | COT - RSBU - Roof Nailing | Passed | Back porch approved. Okay for roofing system. 6/4/2025 | |
| 09/10/2025 | COT - RSEL - Grounding/Bonding | Passed | 9.10.2025 Verified rod spacing and depth. |
|
| 09/10/2025 | COT - RSEL - Electrical Underground | Passed | 9.10.2025 2" Schedule 40 conduit running from MSP to transformer pending TEP connection. Okay to backfill, shading required. |
|
| 09/16/2025 | BULD - Electrical Clearance | Passed | TEP CLEARANCE: INCR, unit 886. | |
| 10/24/2025 | COT - RSEL - Outdoor Lighting | Passed | 10-24-25: outdoor lighting approved. | |
| 10/28/2025 | COT - RSME - Mechanical Final | Passed | 10/28/25 Pass |
|
| 10/28/2025 | RSBU - Building Final | Passed | ||
| 10/28/2025 | COT - RSEL - Electrical Final | Passed | 10/28/25 Pass |
|
| 11/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/04/2025 | COT - RSBU - Preslab | Passed | ||
| 11/04/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 11/04/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 11/04/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/04/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/04/2025 | COT - RSPL - Rough Soil | Passed | ||
| 11/04/2025 | RSPL - Plumbing Progress | Passed |