Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0324-01658
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7919 S SENTINAL STONE DR
Address NEW:
7919 S SENTINAL STONE DR
Apply Date:
03/20/2024
Applicant:
Diana Sestiaga
Description:
Residential Solar PV system: 11.20 KW
Permit Reviews
Permit Number - TC-RES-0324-01658
Permit Status: Complete
Permit Description: Residential Solar PV system: 11.20 KW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2024 | RESIDENTIAL SOLAR v.1 | 04/19/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0324-01658
Permit Status: Complete
Permit Description: Residential Solar PV system: 11.20 KW
| Date | Description | Comments |
|---|---|---|
| 04/22/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 04/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0324-01658
Permit Description: Residential Solar PV system: 11.20 KW
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2024 | BULD - Electrical Clearance | Passed | Approved with 175A derate, DGC Clearance to TEP is required for the solar meter | |
| 06/21/2024 | RSBU - Building Final | Passed | ||
| 06/21/2024 | COT - RSOL - Electrical Final Solar Project | Passed |