Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/11/2024
Applicant:
Description:
Retaining Wall 2' -3' Tall 109' Long with 5' wall

Permit Reviews

Permit Number - TC-RES-0324-01455
Permit Status: Complete
Permit Description: Retaining Wall 2' -3' Tall 109' Long with 5' wall
Start Date Submittal Complete Date Status  
03/14/2024 RESIDENTIAL FENCE/WALL v.2 04/01/2024 APPROVED Review Details
03/13/2024 RESIDENTIAL FENCE/WALL v.1 03/14/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0324-01455
Permite Description: Retaining Wall 2' -3' Tall 109' Long with 5' wall
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/22/2024 COT - RSBU - Masonry Pregrout N/A Partial Pass First lift good to go for grout.
05/03/2024 RSBU - Building Final N/A Not Ready The Royce walls for this site I have not been completed at this time and still have to be constructed currently only the stem walls are complete and the retaining walls are complete. I have advised MJM construction that once the rice walls are done then they can call Lynn for the final wall inspection, but it has to be completely built.
05/02/2024 COT - RSBU - Stem Wall/Retaining Wall N/A Partial Pass Replaces Masonry Pregrout V2, & Res Final. Footing and Prior pregrout passed.

Retaining walls have been constructed at this time no inspection was done by the engineering section. Engineer record needs to provide a certification letter, stamped and sealed for all work done prior to this date.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0324-01455
Permit Description: Retaining Wall 2' -3' Tall 109' Long with 5' wall
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/02/2024 COT - RSBU - Masonry Pregrout Passed Retaining walls have been constructed at this time no inspection was done by the engineering section. Engineer record needs to provide a certification letter, stamped and sealed for all work done prior to this date.
05/16/2024 COT - RSBU - Stem Wall/Retaining Wall Passed I inspected the stem wall, but I did not inspect the footer on this particular address contractor needs the engineer of record to sign off on the footer

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-VALENCIA CROSSING PLOT PLAN LOT 13 5221 E CARAMBOLA CT_V1.PDF DOCUMENTS VIEW
VALENCIA CROSSINGS WALL DETAIL LOT 13 5221 E CARAMBOLA CT_V1.PDF DOCUMENTS VIEW