Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
7337 E CASCADA CI
Apply Date:
03/30/2023
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 3700W DC, 2900W AC • MODULES: (10) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (10) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION

Permit Reviews

Permit Number - TC-RES-0323-04004
Permit Status: Complete
Permit Description: • SYSTEM SIZE: 3700W DC, 2900W AC • MODULES: (10) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (10) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION
Start Date Submittal Complete Date Status  
07/07/2023 RESIDENTIAL SOLAR v.1 07/18/2023 APPROVED Review Details
03/31/2023 RESIDENTIAL SOLAR v.1 04/21/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0323-04004
Permit Description: • SYSTEM SIZE: 3700W DC, 2900W AC • MODULES: (10) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (10) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/15/2023 RSBU - Building Final Passed
06/15/2023 COT - RSEL - Electrical Final Passed 6/15/23 DGL clearance approved for TEP
07/20/2023 COT - RSOL - Electrical Final Solar Project Passed Complete, DGC Clearance is required
07/20/2023 BULD - Electrical Clearance Passed DGC Clearance required

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_NAVARRO RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
2_NAVARRO STRUCTURAL LETTER-CALCS_V1.PDF DOCUMENTS VIEW
CONS-2_NAVARRO PLAN SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_NAVARRO CONTRACTORS LETTER_V1.PDF DOCUMENTS VIEW
1_NAVARRO PLAN SET_V1.PDF DOCUMENTS VIEW
1_NAVARRO SPEC SHEETS_V1.PDF DOCUMENTS VIEW
1_NAVARRO STRUCTURAL LETTER-CALCS_V1.PDF DOCUMENTS VIEW