Permit: TC-RES-0323-03887
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
7510 E 32ND ST
Address NEW:
7510 E 32ND ST
Apply Date:
03/27/2023
Applicant:
BRANDY PALCHETTI
Description:
New Photovoltaic System SIZE: 9620W DC, 7540W AC • MODULES: (26) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (26) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335
Permit Reviews
Permit Number - TC-RES-0323-03887
Permit Status: Issued
Permit Description: New Photovoltaic System SIZE: 9620W DC, 7540W AC
• MODULES: (26) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (26) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT:
SNR-DC-00335
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2023 | RESIDENTIAL SOLAR v.1 | 04/18/2023 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0323-03887
Permit Description: New Photovoltaic System SIZE: 9620W DC, 7540W AC
• MODULES: (26) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (26) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT:
SNR-DC-00335
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 05/09/2023 | RSBU - Building Final | Passed | ||
| 05/09/2023 | COT - RSEL - Electrical Final | Passed |