Permit: TC-RES-0323-03869
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
9016 E POMEGRANATE ST
Address NEW:
9016 E POMEGRANATE ST
Apply Date:
03/27/2023
Applicant:
BRANDY PALCHETTI
Description:
New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel • MODULES: (18) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 • MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Permit Reviews
Permit Number - TC-RES-0323-03869
Permit Status: Issued
Permit Description: New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel
• MODULES: (18) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING
SNR-DC-00438
• MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL
WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225
AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/27/2023 | RESIDENTIAL SOLAR v.1 | 05/18/2023 | APPROVED |
| 03/27/2023 | RESIDENTIAL SOLAR v.1 | 04/18/2023 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0323-03869
Permite Description: New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel
• MODULES: (18) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING
SNR-DC-00438
• MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL
WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225
AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for meter collar, DGL Clearance was called into TEP at 10:15am |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0323-03869
Permit Description: New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel
• MODULES: (18) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING
SNR-DC-00438
• MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL
WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225
AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2023 | RSBU - Building Final | Passed | ||
| 10/02/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/02/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |