Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
03/27/2023
Applicant:
Ladonna Martin
Description:
New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel • MODULES: (18) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 • MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.

Permit Reviews

Permit Number - TC-RES-0323-03869
Permit Status: Issued
Permit Description: New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel • MODULES: (18) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 • MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Start Date Submittal Complete Date Status  
04/27/2023 RESIDENTIAL SOLAR v.1 05/18/2023 APPROVED Review Details
03/27/2023 RESIDENTIAL SOLAR v.1 04/18/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0323-03869
Permite Description: New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel • MODULES: (18) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 • MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/20/2023 BULD - Electrical Clearance N/A Partial Pass Partial for meter collar, DGL Clearance was called into TEP at 10:15am

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0323-03869
Permit Description: New Photovoltaic System 18 panels / Micro Inverters, 6660W DC, 5220W AC, NEW 200 AMP Main Panel • MODULES: (18) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (18) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 • MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH NO MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/02/2023 RSBU - Building Final Passed
10/02/2023 COT - RSEL - Electrical Final Passed
10/02/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_ELLIOTT REVISED PLAN SET_V1.PDF DOCUMENTS VIEW
2_ELLIOTT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
1_T. ELLIOTT PLAN SET_V1.PDF DOCUMENTS VIEW
1_T. ELLIOTT CONTRACTORS LETTER_V1.PDF DOCUMENTS VIEW
1_T. ELLIOTT SPEC SHEETS_V1.PDF DOCUMENTS VIEW
1_T. ELLIOTT STRUCTURAL LETTER-CALCS_V1.PDF DOCUMENTS VIEW