Permit: TC-RES-0323-03813
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5101 S MISSIONDALE RD
Address NEW:
5101 S MISSIONDALE RD
Apply Date:
03/23/2023
Applicant:
Jose Quintero
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0323-03813
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2023 | APPROVED |
| 03/24/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/20/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0323-03813
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 04/20/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 09/26/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03813
Permit Description: SFR
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a water test that is holding. Okay to backfill trenches and prepare subsoil for compaction. | |
| 05/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/12/2023 | COT - RSBU - Preslab | Passed | ||
| 05/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/22/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | H2.5 clips are installed on trusses. 1/2" OSB corner bracing is properly installed and nailed off. Okay to cover exterior for stucco application. | |
| 05/22/2023 | COT - RSBU - Roof Nailing | Passed | Roof is properly nailed off. Okay to dry-in roof. | |
| 05/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/25/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 5/25/2023 | |
| 06/30/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 07/19/2023 | RSBU - Building Final | Passed | 7/19/23: Insulate Waterhouse bib with foam and wrap with uv rated tape | |
| 08/31/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/31/2023 | COT - RSME - Mechanical Final | Passed | ||
| 08/31/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/31/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 08/31/2023 | COT - RSPL - Sewer | Passed |