Permit: TC-RES-0323-03735
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2530 E MABEL ST
Address NEW:
2530 E MABEL ST
Apply Date:
03/20/2023
Applicant:
Gregory Anderson
Description:
Interior Remodel Owner's Bath: additional framing for rearranged bath and closet (no load bearing walls removed; working around) Replace windows and door Replace cabinets, countertops, light fixture, plumbing fixtures, etc.
Permit Reviews
Permit Number - TC-RES-0323-03735
Permit Status: Complete
Permit Description: Interior Remodel
Owner's Bath: additional framing for rearranged bath and closet (no load bearing walls removed; working around)
Replace windows and door
Replace cabinets, countertops, light fixture, plumbing fixtures, etc.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/22/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/14/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03735
Permite Description: Interior Remodel
Owner's Bath: additional framing for rearranged bath and closet (no load bearing walls removed; working around)
Replace windows and door
Replace cabinets, countertops, light fixture, plumbing fixtures, etc.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03735
Permit Description: Interior Remodel
Owner's Bath: additional framing for rearranged bath and closet (no load bearing walls removed; working around)
Replace windows and door
Replace cabinets, countertops, light fixture, plumbing fixtures, etc.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections have been made. 5/5/2023 | |
| 07/13/2023 | COT - RSEL - Electrical Final | Passed | ||
| 07/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 07/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/18/2023 | COT - RSME - Mechanical Final | Passed | ||
| 07/18/2023 | RSBU - Building Final | Passed |