Permit: TC-RES-0323-03515
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
908 W PENNSYLVANIA ST
Address NEW:
908 W PENNSYLVANIA ST
Apply Date:
03/12/2023
Applicant:
Oscar Juarez
Description:
Fire Repair and Remodel (T22DV03783)
Permit Reviews
Permit Number - TC-RES-0323-03515
Permit Status: Complete
Permit Description: Fire Repair and Remodel (T22DV03783)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2023 | RESIDENTIAL NEW DWELLING v.3 | 05/08/2023 | APPROVED |
| 03/14/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/10/2023 | REQUIRES RESUBMIT |
| 04/15/2023 | RESIDENTIAL NEW DWELLING v.2 | 05/05/2023 | REQUIRES RESUBMIT |
| 05/31/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/01/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0323-03515
Permit Status: Complete
Permit Description: Fire Repair and Remodel (T22DV03783)
| Date | Description | Comments |
|---|---|---|
| 05/08/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 04/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03515
Permite Description: Fire Repair and Remodel (T22DV03783)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2024 | COT - RSEL - Electrical Final | N/A | Not Ready | need strain relief for whip on water heater |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03515
Permit Description: Fire Repair and Remodel (T22DV03783)
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2023 | BULD - Electrical Clearance | Passed | Approved, INCR Clearance to TEP is required for construction power (burnt building) | |
| 06/23/2023 | COT - RSPL - Rough Soil | Passed | ||
| 06/23/2023 | COT - RSPL - Sewer | Passed | ||
| 07/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 08/17/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/09/2024 | COT - RSME - Mechanical Final | Passed | ||
| 02/09/2024 | RSBU - Building Final | Passed | ||
| 02/09/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 02/09/2024 | COT - RSEL - Electrical Final | Passed |