Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0323-03484
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2040 W SADDLE HILLS DR
Address NEW:
2040 W SADDLE HILLS DR
Apply Date:
03/09/2023
Applicant:
David Carrasco
Description:
Garage
Permit Reviews
Permit Number - TC-RES-0323-03484
Permit Status: Complete
Permit Description: Garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/03/2023 | REQUIRES RESUBMIT |
| 04/26/2023 | RESTAMP - RESIDENTIAL v.1 | 04/26/2023 | APPROVED |
| 05/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/23/2024 | APPROVED |
| 04/18/2023 | RESIDENTIAL NEW DWELLING v.2 | 04/26/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0323-03484
Permit Status: Complete
Permit Description: Garage
| Date | Description | Comments |
|---|---|---|
| 04/26/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 03/27/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03484
Permite Description: Garage
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
| 06/28/2024 | COT - RSEL - Electrical Underground | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03484
Permit Description: Garage
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/23/24: footing depth not per plan throughout. 5/24/24: corrections made ok to proceed |
|
| 05/24/2024 | COT - RSBU - Preslab | Passed | 5/23/24: footing depth not per plan throughout. 5/24/24: corrections made ok to proceed |
|
| 06/12/2024 | COT - RSBU - Roof Nailing | Passed | Exterior clips and sheathing approved also. 6/12/2024 | |
| 06/12/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Please fire foam all top plate, penetrations make up grounds and all boxes and install sub panel ground strip with grounds made up for split neutral and ground bus, minimum depth for electrical conduit on ~his 18 inches 7/11/24: corrections made ok to backfill. |
|
| 07/11/2024 | COT - RSEL - Electrical Underground | Passed | 18 inches is minimum depth for conduit to the top of the conduit 7/11/24: corrections made ok to backfill. |
|
| 12/13/2024 | COT - RSEL - Electrical Final | Passed | ||
| 12/13/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/13/2024 | RSBU - Building Final | Passed |