Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/08/2023
Applicant:
Description:
115' Long 3' High Retaining Side Wall 115' Long 2' High Retaining Side Wall

Permit Reviews

Permit Number - TC-RES-0323-03407
Permit Status: Complete
Permit Description: 115' Long 3' High Retaining Side Wall 115' Long 2' High Retaining Side Wall
Start Date Submittal Complete Date Status  
04/11/2023 RESTAMP - RESIDENTIAL v.1 04/13/2023 APPROVED Review Details
03/16/2023 RESIDENTIAL NEW DWELLING v.1 04/11/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0323-03407
Permite Description: 115' Long 3' High Retaining Side Wall 115' Long 2' High Retaining Side Wall
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/25/2024 ENGR Engineering Final N/A Not Applicable This inspection belong to the building department, reschedule it to the building department
03/25/2024 SITE - Zoning Final N/A Not Applicable This inspection belongs to the building department, reschedule it through the building department

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0323-03407
Permit Description: 115' Long 3' High Retaining Side Wall 115' Long 2' High Retaining Side Wall
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed CMU block fence is complete and gates are properly installed. All footings, stem wall, rebar, and grout pours were inspected by a third party testing company. Okay to issue Certificate of Completion for this permit.
03/25/2024 COT - RSBU - Masonry Pregrout Passed CMU block fence is complete and gates are properly installed. All footings, stem wall, rebar, and grout pours were inspected by a third party testing company. Okay to issue Certificate of Completion for this permit.
03/25/2024 COT - RSBU - Stem Wall/Retaining Wall Passed CMU block fence is complete and gates are properly installed. All footings, stem wall, rebar, and grout pours were inspected by a third party testing company. Okay to issue Certificate of Completion for this permit.
03/25/2024 RSBU - Building Final Passed CMU block fence is complete and gates are properly installed. Okay to issue Certificate of Completion for this permit.
03/25/2024 RSBU - Building Progress Passed CMU block fence is complete and gates are properly installed. All footings, stem wall, rebar, and grout pours were inspected by a third party testing company. Okay to issue Certificate of Completion for this permit.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RINCON KNOLLS LOT 273 PLOT PLAN_V1.PDF DOCUMENTS VIEW
RINCON KNOLLS STRUC PLANS_V1.PDF DOCUMENTS VIEW