Permit: TC-RES-0226-01010
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3750 N COUNTRY CLUB RD UNIT 32
Address NEW:
3750 N COUNTRY CLUB RD UNIT 32
Apply Date:
02/26/2026
Applicant:
Arturo Ochoa
Description:
Our plumbers will repair four gas lines serving the affected units. The technician will require full access to all four units to complete the work safely and efficiently. Work will include excavation of the underground gas lines between the gas meter and the building at an approximate depth of 4–5 ft. Once the damaged gas lines are located and identified, all compromised sections will be removed and replaced with new gas piping. All new gas lines will be properly installed and connected to their designated locations in accordance with current local gas codes and safety regulations.
Permit Reviews
Permit Number - TC-RES-0226-01010
Permit Status: Complete
Permit Description: Our plumbers will repair four gas lines serving the affected units. The technician will require full access to all four units to complete the work safely and efficiently.
Work will include excavation of the underground gas lines between the gas meter and the building at an approximate depth of 4–5 ft. Once the damaged gas lines are located and identified, all compromised sections will be removed and replaced with new gas piping.
All new gas lines will be properly installed and connected to their designated locations in accordance with current local gas codes and safety regulations.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 03/02/2026 | APPROVED |
| 02/27/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 02/27/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0226-01010
Permit Status: Complete
Permit Description: Our plumbers will repair four gas lines serving the affected units. The technician will require full access to all four units to complete the work safely and efficiently.
Work will include excavation of the underground gas lines between the gas meter and the building at an approximate depth of 4–5 ft. Once the damaged gas lines are located and identified, all compromised sections will be removed and replaced with new gas piping.
All new gas lines will be properly installed and connected to their designated locations in accordance with current local gas codes and safety regulations.
| Date | Description | Comments |
|---|---|---|
| 02/27/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-01010
Permit Description: Our plumbers will repair four gas lines serving the affected units. The technician will require full access to all four units to complete the work safely and efficiently.
Work will include excavation of the underground gas lines between the gas meter and the building at an approximate depth of 4–5 ft. Once the damaged gas lines are located and identified, all compromised sections will be removed and replaced with new gas piping.
All new gas lines will be properly installed and connected to their designated locations in accordance with current local gas codes and safety regulations.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | COT - BULD - SWG Clearance | Passed | 3.6.26 Approved for SWG clearance |
|
| 03/06/2026 | COT - RSPL - Plumbing Final | Passed | 3.6.26 approved |
|
| 03/06/2026 | COT - RSPL - Rough Soil | Passed | 3.6.26 approved |
|
| 03/06/2026 | RSBU - Building Final | Passed | 3.6.26 approved |