Permit: TC-RES-0226-01001
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4881 E 17TH ST
Address NEW:
4881 E 17TH ST
Apply Date:
02/26/2026
Applicant:
Brittney Neely
Description:
REV_3 moved utility isolation disconnect and DG meter next to SES REV_2, Inverter Revised + Conductor sizing REV_1, System Size Revised to 6.60 kW DC Installation of a 11.440 kW rooftop mounted photovoltaic system with battery storage system.
Permit Reviews
Permit Number - TC-RES-0226-01001
Permit Status: Inspections
Permit Description: REV_3 moved utility isolation disconnect and DG meter next to SES
REV_2, Inverter Revised + Conductor sizing
REV_1, System Size Revised to 6.60 kW DC
Installation of a 11.440 kW rooftop mounted photovoltaic system with battery storage system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/02/2026 | RESIDENTIAL SOLAR REVISION v.1 | 06/04/2026 | APPROVED |
| 02/26/2026 | RESIDENTIAL SOLAR v.1 | 03/12/2026 | APPROVED |
| 03/13/2026 | RESIDENTIAL SOLAR REVISION v.1 | 03/25/2026 | APPROVED |
| 06/18/2026 | RESIDENTIAL SOLAR REVISION v.1 | 06/23/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-01001
Permit Status: Inspections
Permit Description: REV_3 moved utility isolation disconnect and DG meter next to SES
REV_2, Inverter Revised + Conductor sizing
REV_1, System Size Revised to 6.60 kW DC
Installation of a 11.440 kW rooftop mounted photovoltaic system with battery storage system.
| Date | Description | Comments |
|---|---|---|
| 02/26/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0226-01001
Permit Description: REV_3 moved utility isolation disconnect and DG meter next to SES
REV_2, Inverter Revised + Conductor sizing
REV_1, System Size Revised to 6.60 kW DC
Installation of a 11.440 kW rooftop mounted photovoltaic system with battery storage system.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2026 | BULD - Electrical Clearance | Passed | PASSED CLEARANCE DGL/DGC/BAT | |
| 07/30/2026 | RSBU - Building Final | Passed | PASSED CLEARANCE DGL/DGC/BAT |