Permit: TC-RES-0226-00995
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
10362 E SIXTO MOLINA LN
Address NEW:
10362 E SIXTO MOLINA LN
Apply Date:
02/26/2026
Applicant:
TFS Solar
Description:
Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0226-00995
Permit Status: Complete
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2026 | RESIDENTIAL SOLAR v.1 | 03/11/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00995
Permit Status: Complete
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
| Date | Description | Comments |
|---|---|---|
| 02/26/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00995
Permite Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00995
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | COT - RSOL - Electrical Underground Solar Project | Passed | X2 1" schedule 40 at 20" depth to the top of pipe. Ran from the garage to the new equipment location. Okay to backfill all progress areas. Shading required. 4/8/2026 | |
| 04/27/2026 | BULD - Electrical Clearance | Passed | ||
| 04/27/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/27/2026 | RSBU - Building Final | Passed |