Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/26/2026
Applicant:
TFS Solar
Description:
Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB

Permit Reviews

Permit Number - TC-RES-0226-00995
Permit Status: Complete
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Start Date Submittal Complete Date Status  
02/26/2026 RESIDENTIAL SOLAR v.1 03/11/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0226-00995
Permit Status: Complete
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Date Description Comments
02/26/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0226-00995
Permite Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/27/2026 COT - RSBU - Excavation/Rebar/Zoning N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0226-00995
Permit Description: Roof mount 4.35 kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/08/2026 COT - RSOL - Electrical Underground Solar Project Passed X2 1" schedule 40 at 20" depth to the top of pipe. Ran from the garage to the new equipment location. Okay to backfill all progress areas. Shading required. 4/8/2026
04/27/2026 BULD - Electrical Clearance Passed
04/27/2026 COT - RSOL - Electrical Final Solar Project Passed
04/27/2026 RSBU - Building Final Passed