Permit: TC-RES-0226-00957
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4861 E LESTER PL UNIT 2
Address NEW:
4861 E LESTER PL UNIT 2
Apply Date:
02/24/2026
Applicant:
fernando palma
Description:
(Site plan in files) New 200 amp 120/240 volt overhead electrical service to feed unit 2
Permit Reviews
Permit Number - TC-RES-0226-00957
Permit Status: Inspections
Permit Description: (Site plan in files) New 200 amp 120/240 volt overhead electrical service to feed unit 2
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 02/25/2026 | REQUIRES RESUBMIT |
| 03/31/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 03/31/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00957
Permit Status: Inspections
Permit Description: (Site plan in files) New 200 amp 120/240 volt overhead electrical service to feed unit 2
| Date | Description | Comments |
|---|---|---|
| 02/24/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0226-00957
Permit Description: (Site plan in files) New 200 amp 120/240 volt overhead electrical service to feed unit 2
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | BULD - Electrical Clearance | Passed | 06/05/2026 Clearance TEP ECO. New service at duplex Unit 2. |
|
| 06/11/2026 | COT - RSEL - Electrical Final | Passed | 06/11/2026 Verified all branch circuits landed and labeled at dead front, SPD installed. |