Permit: TC-RES-0226-00949
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4933 E COOPER ST
Address NEW:
4933 E COOPER ST
Apply Date:
02/24/2026
Applicant:
TFS Solar
Description:
Roof mount 4.35kW DC photovoltaic solar system; 10 modules, 3.8kW Tesla Solar Inverter with 1 string, 20A PV breaker on 200A bus with 200A MCB. Remove existing roof modules, re-use existing 60A pv disco and DG meter.
Permit Reviews
Permit Number - TC-RES-0226-00949
Permit Status: Complete
Permit Description: Roof mount 4.35kW DC photovoltaic solar system; 10 modules, 3.8kW Tesla Solar Inverter with 1 string, 20A PV breaker on 200A bus with 200A MCB. Remove existing roof modules, re-use existing 60A pv disco and DG meter.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2026 | RESIDENTIAL SOLAR v.1 | 03/24/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00949
Permit Status: Complete
Permit Description: Roof mount 4.35kW DC photovoltaic solar system; 10 modules, 3.8kW Tesla Solar Inverter with 1 string, 20A PV breaker on 200A bus with 200A MCB. Remove existing roof modules, re-use existing 60A pv disco and DG meter.
| Date | Description | Comments |
|---|---|---|
| 02/24/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00949
Permit Description: Roof mount 4.35kW DC photovoltaic solar system; 10 modules, 3.8kW Tesla Solar Inverter with 1 string, 20A PV breaker on 200A bus with 200A MCB. Remove existing roof modules, re-use existing 60A pv disco and DG meter.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 4/16/2026 | |
| 04/16/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/16/2026 | RSBU - Building Final | Passed |