Permit: TC-RES-0226-00934
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
442 W CALLE MARGARITA
Address NEW:
442 W CALLE MARGARITA
Apply Date:
02/23/2026
Applicant:
David Hosking
Description:
REV1: inverter updated to an SE7600; LST configuration revised to include a tap box, a line-side tap, and a Polaris tap connector Rooftop PV Solar + ESS
Permit Reviews
Permit Number - TC-RES-0226-00934
Permit Status: Complete
Permit Description: REV1: inverter updated to an SE7600; LST configuration revised to include a tap box, a line-side tap, and a Polaris tap connector
Rooftop PV Solar + ESS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2026 | RESIDENTIAL SOLAR REVISION v.1 | 07/28/2026 | APPROVED |
| 02/24/2026 | RESIDENTIAL SOLAR v.1 | 03/23/2026 | REQUIRES RESUBMIT |
| 03/26/2026 | RESIDENTIAL SOLAR v.2 | 04/03/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00934
Permit Status: Complete
Permit Description: REV1: inverter updated to an SE7600; LST configuration revised to include a tap box, a line-side tap, and a Polaris tap connector
Rooftop PV Solar + ESS
| Date | Description | Comments |
|---|---|---|
| 02/24/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00934
Permite Description: REV1: inverter updated to an SE7600; LST configuration revised to include a tap box, a line-side tap, and a Polaris tap connector
Rooftop PV Solar + ESS
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2026 | BULD - Electrical Clearance | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00934
Permit Description: REV1: inverter updated to an SE7600; LST configuration revised to include a tap box, a line-side tap, and a Polaris tap connector
Rooftop PV Solar + ESS
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2026 | COT - RSOL - Electrical Final Solar Project | Passed | Passed CLEARANCE DGC/BAT | |
| 09/22/2026 | RSBU - Building Final | Passed |