Permit: TC-RES-0226-00875
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
46 W UNIVERSITY BL
Address NEW:
46 W UNIVERSITY BL
Apply Date:
02/19/2026
Applicant:
TFS Solar
Description:
Roof mount 1.7 kW DC addition to existing photovoltaic solar system (new total system size: 6.76 kW), 4 additional modules added to existing inverter, 18 modules total. Existing interconnection through 6.0kW inverter to 40A PV breaker on 200A bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0226-00875
Permit Status: Complete
Permit Description: Roof mount 1.7 kW DC addition to existing photovoltaic solar system (new total system size: 6.76 kW), 4 additional modules added to existing inverter, 18 modules total. Existing interconnection through 6.0kW inverter to 40A PV breaker on 200A bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2026 | RESIDENTIAL SOLAR v.1 | 03/09/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00875
Permit Status: Complete
Permit Description: Roof mount 1.7 kW DC addition to existing photovoltaic solar system (new total system size: 6.76 kW), 4 additional modules added to existing inverter, 18 modules total. Existing interconnection through 6.0kW inverter to 40A PV breaker on 200A bus with 200A MCB.
| Date | Description | Comments |
|---|---|---|
| 02/20/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00875
Permit Description: Roof mount 1.7 kW DC addition to existing photovoltaic solar system (new total system size: 6.76 kW), 4 additional modules added to existing inverter, 18 modules total. Existing interconnection through 6.0kW inverter to 40A PV breaker on 200A bus with 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | BULD - Electrical Clearance | Passed | 04/02/2026 Approved clearance TEP DGC. Added only 4 panels to existing PV system, PV meter not pulled. |
|
| 04/02/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 04/02/2026 Approved clearance TEP DGC. Added only 4 panels to existing PV system, PV meter not pulled. |
|
| 04/02/2026 | RSBU - Building Final | Passed |