Permit: TC-RES-0226-00689
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6722 E 39TH ST
Address NEW:
6722 E 39TH ST
Apply Date:
02/09/2026
Applicant:
scott forster
Description:
INSTALLATION OF 01 - TESLA POWERWALL 3 BATTERY ESS, AND NEW 225A SUB PANEL.
Permit Reviews
Permit Number - TC-RES-0226-00689
Permit Status: Complete
Permit Description: INSTALLATION OF 01 - TESLA POWERWALL 3 BATTERY ESS, AND NEW 225A SUB PANEL.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2026 | RESIDENTIAL SOLAR v.1 | 02/19/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00689
Permit Status: Complete
Permit Description: INSTALLATION OF 01 - TESLA POWERWALL 3 BATTERY ESS, AND NEW 225A SUB PANEL.
| Date | Description | Comments |
|---|---|---|
| 02/09/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00689
Permit Description: INSTALLATION OF 01 - TESLA POWERWALL 3 BATTERY ESS, AND NEW 225A SUB PANEL.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | BULD - Electrical Clearance | Passed | 04/02/2026 Approved clearance TEP BAT to existing PV system. GDL verbal at 10am for MSA. |
|
| 04/02/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 04/02/2026 Approved clearance TEP BAT to existing PV system. GDL verbal at 10am for MSA. Verified added paver to protect PW3. |