Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
8349 E BALFOUR PL
Apply Date:
02/04/2026
Applicant:
Bright Home Energy
Description:
NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND ENERGY STORAGE SYSTEM (POWERWALL 3) 5.265 KW DC & 11.50 KW AC

Permit Reviews

Permit Number - TC-RES-0226-00558
Permit Status: Inspections
Permit Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND ENERGY STORAGE SYSTEM (POWERWALL 3) 5.265 KW DC & 11.50 KW AC
Start Date Submittal Complete Date Status  
03/06/2026 RESIDENTIAL SOLAR v.2 03/27/2026 APPROVED Review Details
02/05/2026 RESIDENTIAL SOLAR v.1 03/05/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0226-00558
Permit Status: Inspections
Permit Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND ENERGY STORAGE SYSTEM (POWERWALL 3) 5.265 KW DC & 11.50 KW AC
Date Description Comments
02/05/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0226-00558
Permite Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND ENERGY STORAGE SYSTEM (POWERWALL 3) 5.265 KW DC & 11.50 KW AC
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/21/2026 BULD - Electrical Clearance N/A Partial Pass 4.21.26
DGL code sent to TEP verbal given at 10:25
Partial pass pending solar

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0226-00558
Permit Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND ENERGY STORAGE SYSTEM (POWERWALL 3) 5.265 KW DC & 11.50 KW AC
Total Completed Inspections - 2
Date Description Inspector Results Comments
04/21/2026 COT - RSOL - Electrical Final Solar Project Passed
04/23/2026 BULD - Electrical Clearance Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-BHE DESIGN PACK (R1) - CRUZ_V2.PDF DOCUMENTS VIEW