Permit: TC-RES-0226-00558
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
8349 E BALFOUR PL
Address NEW:
8349 E BALFOUR PL
Apply Date:
02/04/2026
Applicant:
Bright Home Energy
Description:
NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND ENERGY STORAGE SYSTEM (POWERWALL 3) 5.265 KW DC & 11.50 KW AC
Permit Reviews
Permit Number - TC-RES-0226-00558
Permit Status: Inspections
Permit Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND
ENERGY STORAGE SYSTEM (POWERWALL 3)
5.265 KW DC & 11.50 KW AC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2026 | RESIDENTIAL SOLAR v.2 | 03/27/2026 | APPROVED |
| 02/05/2026 | RESIDENTIAL SOLAR v.1 | 03/05/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0226-00558
Permit Status: Inspections
Permit Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND
ENERGY STORAGE SYSTEM (POWERWALL 3)
5.265 KW DC & 11.50 KW AC
| Date | Description | Comments |
|---|---|---|
| 02/05/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0226-00558
Permite Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND
ENERGY STORAGE SYSTEM (POWERWALL 3)
5.265 KW DC & 11.50 KW AC
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2026 | BULD - Electrical Clearance | N/A | Partial Pass | 4.21.26 DGL code sent to TEP verbal given at 10:25 Partial pass pending solar |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0226-00558
Permit Description: NSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM AND
ENERGY STORAGE SYSTEM (POWERWALL 3)
5.265 KW DC & 11.50 KW AC
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/23/2026 | BULD - Electrical Clearance | Passed |