Permit: TC-RES-0226-00540
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
810 N CAMINO SANTIAGO BLDG 0 UNIT 26
Address NEW:
810 N CAMINO SANTIAGO BLDG 0 UNIT 26
Apply Date:
02/03/2026
Applicant:
TFS Solar
Description:
Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
Permit Reviews
Permit Number - TC-RES-0226-00540
Permit Status: Complete
Permit Description: Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2026 | RESIDENTIAL SOLAR v.1 | 02/12/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00540
Permit Status: Complete
Permit Description: Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
| Date | Description | Comments |
|---|---|---|
| 02/04/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0226-00540
Permit Description: Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2026 | BULD - Electrical Clearance | Passed | 2.25.26 Approved for DGC |
|
| 02/25/2026 | RSBU - Building Final | Passed | 2.25.26 approved |
|
| 02/25/2026 | COT - RSOL - Electrical Final Solar Project | Passed | PV system is installed per plans |