Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/03/2026
Applicant:
TFS Solar
Description:
Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.

Permit Reviews

Permit Number - TC-RES-0226-00540
Permit Status: Complete
Permit Description: Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
Start Date Submittal Complete Date Status  
02/04/2026 RESIDENTIAL SOLAR v.1 02/12/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0226-00540
Permit Status: Complete
Permit Description: Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
Date Description Comments
02/04/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0226-00540
Permit Description: Roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 6.88 kW), 6 additional AC modules (1 branch), added to existing PV combiner box. Interconnection via 120% rule. Upsize interconnection to 30A with existing #8 wire.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/25/2026 BULD - Electrical Clearance Passed 2.25.26
Approved for DGC
02/25/2026 RSBU - Building Final Passed 2.25.26
approved
02/25/2026 COT - RSOL - Electrical Final Solar Project Passed PV system is installed per plans

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-OAKLAND DONALD PV ADD-DRAWINGS_V1.PDF DOCUMENTS VIEW
OAKLAND DONALD PV ADD-SPECS_V1.PDF DOCUMENTS VIEW