Permit: TC-RES-0225-01101
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
11051 E OLD SPANISH TR
Address NEW:
11051 E OLD SPANISH TR
Apply Date:
02/28/2025
Applicant:
Hailey McGaw
Description:
THIS PROJECT IS COMPRISED OF THE FOLLOWING: · NEW PHOTOVOLTAIC MODULES · NEW DC/AC INVERTER(S) · NEW PHOTOVOLTAIC AC COMBINER PANEL · NEW UTILITY DG METER SOCKET · NEW UTILITY DG FUSED DISCONNECT SWITCH · NEW PHOTOVOLTAIC ISOLATED DEDICATED BACK-FEED BREAKER · NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Permit Reviews
Permit Number - TC-RES-0225-01101
Permit Status: Complete
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· NEW PHOTOVOLTAIC MODULES
· NEW DC/AC INVERTER(S) · NEW PHOTOVOLTAIC AC COMBINER PANEL
· NEW UTILITY DG METER SOCKET
· NEW UTILITY DG FUSED DISCONNECT SWITCH
· NEW PHOTOVOLTAIC ISOLATED DEDICATED BACK-FEED BREAKER
· NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/28/2025 | RESIDENTIAL SOLAR v.1 | 03/31/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-01101
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· NEW PHOTOVOLTAIC MODULES
· NEW DC/AC INVERTER(S) · NEW PHOTOVOLTAIC AC COMBINER PANEL
· NEW UTILITY DG METER SOCKET
· NEW UTILITY DG FUSED DISCONNECT SWITCH
· NEW PHOTOVOLTAIC ISOLATED DEDICATED BACK-FEED BREAKER
· NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2025 | RSBU - Building Final | Passed | 6.27.25 PV system is installed per plans. Proper sized conductors used throughout and verified. Proper labels and markings verified on conduits and panels. Panel schedule verified. Grounding and bonding verified. White at neutrals. All panels and PV panels properly secured. |
|
| 06/27/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 6.27.25 PV system is installed per plans. Proper sized conductors used throughout and verified. Proper labels and markings verified on conduits and panels. Panel schedule verified. Grounding and bonding verified. White at neutrals. All panels and PV panels properly secured. |
|
| 06/27/2025 | BULD - Electrical Clearance | Passed | 6.27.25 PV system is installed per plans. Proper sized conductors used throughout and verified. Proper labels and markings verified on conduits and panels. Panel schedule verified. Grounding and bonding verified. White at neutrals. All panels and PV panels properly secured. |