Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3115 E LESTER ST
Address NEW:
3115 E LESTER ST
Apply Date:
02/27/2025
Applicant:
Louis Woofenden
Description:
Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.

Permit Reviews

Permit Number - TC-RES-0225-01083
Permit Status: Complete
Permit Description: Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
Start Date Submittal Complete Date Status  
02/27/2025 RESIDENTIAL SIMPLE REVIEW v.1 03/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0225-01083
Permit Status: Complete
Permit Description: Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
Date Description Comments
02/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0225-01083
Permit Description: Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/25/2025 RSBU - Building Final Passed
04/25/2025 BULD - Electrical Clearance Passed 4/25/25
TEP clearance: DGC
04/25/2025 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_CONSTRUCTION_DRAWINGS_V1.PDF DOCUMENTS VIEW