Permit: TC-RES-0225-01083
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3115 E LESTER ST
Address NEW:
3115 E LESTER ST
Apply Date:
02/27/2025
Applicant:
Louis Woofenden
Description:
Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
Permit Reviews
Permit Number - TC-RES-0225-01083
Permit Status: Complete
Permit Description: Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 03/03/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0225-01083
Permit Status: Complete
Permit Description: Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
| Date | Description | Comments |
|---|---|---|
| 02/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-01083
Permit Description: Relocate the ground-level solar electric components to be adjacent to the main service panel on the detached garage. Will require DG clearance for TEP.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2025 | RSBU - Building Final | Passed | ||
| 04/25/2025 | BULD - Electrical Clearance | Passed | 4/25/25 TEP clearance: DGC |
|
| 04/25/2025 | COT - RSEL - Electrical Final | Passed |