Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0225-00981
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2763 S PANTANO EDGE DR
Address NEW:
2763 S PANTANO EDGE DR
Apply Date:
02/21/2025
Applicant:
Natalia Soto
Description:
1 TESLA POWERWALL 2.0 and 175A Main Breaker Derate
Permit Reviews
Permit Number - TC-RES-0225-00981
Permit Status: Complete
Permit Description: 1 TESLA POWERWALL 2.0 and 175A Main Breaker Derate
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2025 | RESIDENTIAL SOLAR v.2 | 06/13/2025 | APPROVED |
| 05/07/2025 | RESIDENTIAL SOLAR v.1 | 05/07/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00981
Permite Description: 1 TESLA POWERWALL 2.0 and 175A Main Breaker Derate
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 175A derate - no clearance reqd Pending solar final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00981
Permit Description: 1 TESLA POWERWALL 2.0 and 175A Main Breaker Derate
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2025 | BULD - Electrical Clearance | Passed | Approved solar and battery with 175A derate - DGC/BAT Clearance to TEP is required for the solar meter | |
| 07/29/2025 | RSBU - Building Final | Passed | ||
| 07/29/2025 | COT - RSOL - Electrical Final Solar Project | Passed |