Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
948 S TYNDALL AV
Address NEW:
948 S TYNDALL AV
Apply Date:
02/17/2025
Applicant:
Kris Bloom
Description:
Upgrade Existing 120/240V, 100Amp Service To 120/240V, 200Amp All In One Service

Permit Reviews

Permit Number - TC-RES-0225-00875
Permit Status: Inspections
Permit Description: Upgrade Existing 120/240V, 100Amp Service To 120/240V, 200Amp All In One Service
Start Date Submittal Complete Date Status  
02/18/2025 RESIDENTIAL SIMPLE REVIEW v.1 02/19/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0225-00875
Permit Status: Inspections
Permit Description: Upgrade Existing 120/240V, 100Amp Service To 120/240V, 200Amp All In One Service
Date Description Comments
02/18/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0225-00875
Permite Description: Upgrade Existing 120/240V, 100Amp Service To 120/240V, 200Amp All In One Service
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/21/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0225-00875
Permit Description: Upgrade Existing 120/240V, 100Amp Service To 120/240V, 200Amp All In One Service
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/21/2025 COT - RSEL - Electrical Final Passed
03/21/2025 BULD - Electrical Clearance Passed Approved 200A service panel upgrade - INCR Clearance was called into TEP at 10am

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SITE PLAN 948 S. TYNDALL AVE PARCEL 124160360_V1.PDF DOCUMENTS VIEW