Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/10/2025
Applicant:
TFS Solar
Description:
Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB

Permit Reviews

Permit Number - TC-RES-0225-00753
Permit Status: Complete
Permit Description: Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
Start Date Submittal Complete Date Status  
02/10/2025 RESIDENTIAL SOLAR v.1 03/17/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0225-00753
Permit Status: Complete
Permit Description: Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
Date Description Comments
03/10/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0225-00753
Permit Description: Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/23/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
04/23/2025 COT - RSOL - Electrical Final Solar Project Passed
04/23/2025 RSBU - Building Final Passed