Permit: TC-RES-0225-00753
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7668 S PACIFIC WILLOW DR
Address NEW:
7668 S PACIFIC WILLOW DR
Apply Date:
02/10/2025
Applicant:
TFS Solar
Description:
Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0225-00753
Permit Status: Complete
Permit Description: Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2025 | RESIDENTIAL SOLAR v.1 | 03/17/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0225-00753
Permit Status: Complete
Permit Description: Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
| Date | Description | Comments |
|---|---|---|
| 03/10/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00753
Permit Description: Roof mount 11.18 kW DC photovoltaic solar system; 26 modules and microinverters, 3 branches, PV combiner box, interconnection via meter 60A socket adapter with 60A breaker to 200A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 04/23/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/23/2025 | RSBU - Building Final | Passed |