Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/06/2025
Applicant:
Matthew Gruendler
Description:
Run 1 1/4 black pipe from meter on roof and drop down to ground about 20 '. Run 1 1/4 poly pipe underground about 63' into basement area and supply gas to water heater, furnace's and stove. Install black tee on roof and run 3/4" pipe about 89' to supply furnace.

Permit Reviews

Permit Number - TC-RES-0225-00714
Permit Status: Inspections complete
Permit Description: Run 1 1/4 black pipe from meter on roof and drop down to ground about 20 '. Run 1 1/4 poly pipe underground about 63' into basement area and supply gas to water heater, furnace's and stove. Install black tee on roof and run 3/4" pipe about 89' to supply furnace.
Start Date Submittal Complete Date Status  
02/07/2025 RESIDENTIAL SIMPLE REVIEW v.2 02/07/2025 REQUIRES RESUBMIT Review Details
02/11/2025 RESIDENTIAL SIMPLE REVIEW v.3 02/11/2025 APPROVED Review Details
02/07/2025 RESIDENTIAL SIMPLE REVIEW v.1 02/07/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0225-00714
Permit Status: Inspections complete
Permit Description: Run 1 1/4 black pipe from meter on roof and drop down to ground about 20 '. Run 1 1/4 poly pipe underground about 63' into basement area and supply gas to water heater, furnace's and stove. Install black tee on roof and run 3/4" pipe about 89' to supply furnace.
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0225-00714
Permit Description: Run 1 1/4 black pipe from meter on roof and drop down to ground about 20 '. Run 1 1/4 poly pipe underground about 63' into basement area and supply gas to water heater, furnace's and stove. Install black tee on roof and run 3/4" pipe about 89' to supply furnace.
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/14/2025 COT - RSPL - Plumbing Final Passed
02/14/2025 COT - BULD - SWG Clearance Passed 14 FEB 25
Southwest Gas Clearance: SWG

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW