Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/05/2025
Applicant:
Don Paz
Description:
Gas line repair reconnect.

Permit Reviews

Permit Number - TC-RES-0225-00674
Permit Status: Complete
Permit Description: Gas line repair reconnect.
Start Date Submittal Complete Date Status  
02/06/2025 RESIDENTIAL SIMPLE REVIEW v.2 02/06/2025 APPROVED Review Details
02/05/2025 RESIDENTIAL SIMPLE REVIEW v.1 02/05/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0225-00674
Permit Status: Complete
Permit Description: Gas line repair reconnect.
Date Description Comments
02/05/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0225-00674
Permit Description: Gas line repair reconnect.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/28/2025 COT - LCPL - Gas Pressure Test Passed
02/28/2025 COT - LCPL - Gas Final Passed
02/28/2025 COT - BULD - SWG Clearance Passed Approved gas piping to BBQ and Fire pit, SWG Clearance is required

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
UPDATED SCHEMATIC_V1.PDF DOCUMENTS VIEW