Permit: TC-RES-0225-00661
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2311 E MABEL ST
Address NEW:
2311 E MABEL ST
Apply Date:
02/04/2025
Applicant:
Mark Flynn
Description:
Install a new 200Amp Meter/Main on the Garage and run 2-1/2" PVC from it to the existing 200Amp All in One so the existing Overhead TEP drop can be removed
Permit Reviews
Permit Number - TC-RES-0225-00661
Permit Status: Complete
Permit Description: Install a new 200Amp Meter/Main on the Garage and run 2-1/2" PVC from it to the existing 200Amp All in One so the existing Overhead TEP drop can be removed
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2025 | RESIDENTIAL SIMPLE REVIEW v.4 | 02/12/2025 | APPROVED |
| 02/10/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 02/10/2025 | REQUIRES RESUBMIT |
| 02/11/2025 | RESIDENTIAL SIMPLE REVIEW v.3 | 02/11/2025 | REQUIRES RESUBMIT |
| 02/05/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 02/06/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0225-00661
Permit Status: Complete
Permit Description: Install a new 200Amp Meter/Main on the Garage and run 2-1/2" PVC from it to the existing 200Amp All in One so the existing Overhead TEP drop can be removed
| Date | Description | Comments |
|---|---|---|
| 02/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00661
Permit Description: Install a new 200Amp Meter/Main on the Garage and run 2-1/2" PVC from it to the existing 200Amp All in One so the existing Overhead TEP drop can be removed
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending final |
|
| 02/21/2025 | COT - RSEL - Electrical Final | Passed |