Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0224-01081
Permit Details
Apply Date:
02/24/2024
Applicant:
christopher Dilts
Description:
Field arrange with TEP power kill. Remove old panel. Install new 30 ck 60 space 200-amp 3r main breaker panel with all new circuit breakers. Install panel surge protection. New 3/0 cu conductors from Millbank to new 200 amp main. New 5/8 ground rods #4 bare copper to Bond. City and TEP to inspect, clearance and reenergize. Retrim interior of home new plugs and switches.
Permit Reviews
Permit Number - TC-RES-0224-01081
Permit Status: Issued
Permit Description: Field arrange with TEP power kill. Remove old panel. Install new 30 ck 60 space 200-amp 3r main breaker panel with all new circuit breakers. Install panel surge protection. New 3/0 cu conductors from Millbank to new 200 amp main. New 5/8 ground rods #4 bare copper to Bond. City and TEP to inspect, clearance and reenergize. Retrim interior of home new plugs and switches.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/26/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 02/26/2024 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0224-01081
Permit Description: Field arrange with TEP power kill. Remove old panel. Install new 30 ck 60 space 200-amp 3r main breaker panel with all new circuit breakers. Install panel surge protection. New 3/0 cu conductors from Millbank to new 200 amp main. New 5/8 ground rods #4 bare copper to Bond. City and TEP to inspect, clearance and reenergize. Retrim interior of home new plugs and switches.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | COT - RSEL - Electrical Final | Passed | Panel upgrade complete. | |
03/05/2024 | BULD - Electrical Clearance | Passed | Clearance called into TEP with power kill reconnect clearance. Clear INCR |