Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
3878 E EVENTIDE ST
Apply Date:
02/08/2024
Applicant:
Babe Kilgore
Description:
Install 8.00kW roof-mounted PV system

Permit Reviews

Permit Number - TC-RES-0224-00769
Permit Status: Complete
Permit Description: Install 8.00kW roof-mounted PV system
Start Date Submittal Complete Date Status  
02/08/2024 RESIDENTIAL SOLAR v.1 03/01/2024 REQUIRES RESUBMIT Review Details
03/19/2024 RESIDENTIAL SOLAR v.2 03/20/2024 APPROVED Review Details
04/11/2024 RESIDENTIAL SOLAR v.1 04/22/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0224-00769
Permit Status: Complete
Permit Description: Install 8.00kW roof-mounted PV system
Date Description Comments
03/20/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
03/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0224-00769
Permit Description: Install 8.00kW roof-mounted PV system
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/09/2024 RSBU - Building Final Passed
05/09/2024 COT - RSOL - Electrical Final Solar Project Passed
05/09/2024 BULD - Electrical Clearance Passed Approved with 175A derate, DGC Clearance to TEP is required for the solar meter