Permit: TC-RES-0223-03159
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
740 W ALAMEDA ST
Address NEW:
740 W ALAMEDA ST
Apply Date:
02/28/2023
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 5440W DC, 4640W AC • MODULES: (16) JA SOLAR: JAM60S10-340/MR • INVERTERS: (16) ENPHASE ENERGY: IQ8PLUS-72-2-US • RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 • MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER
Permit Reviews
Permit Number - TC-RES-0223-03159
Permit Status: Complete
Permit Description: • SYSTEM SIZE: 5440W DC, 4640W AC
• MODULES: (16) JA SOLAR: JAM60S10-340/MR
• INVERTERS: (16) ENPHASE ENERGY: IQ8PLUS-72-2-US
• RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE; ULTRA RAIL SPEEDSEAL FOOT, SEE
DRAWING SNR-DC-00438
• MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN
PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/08/2023 | RESIDENTIAL SOLAR v.1 | 04/06/2023 | REQUIRES RESUBMIT |
| 06/30/2023 | RESTAMP - RESIDENTIAL v.1 | 06/30/2023 | APPROVED |
| 05/08/2023 | RESIDENTIAL SOLAR v.2 | 05/25/2023 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-03159
Permit Description: • SYSTEM SIZE: 5440W DC, 4640W AC
• MODULES: (16) JA SOLAR: JAM60S10-340/MR
• INVERTERS: (16) ENPHASE ENERGY: IQ8PLUS-72-2-US
• RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE; ULTRA RAIL SPEEDSEAL FOOT, SEE
DRAWING SNR-DC-00438
• MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN
PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2023 | RSBU - Building Final | Passed | ||
| 11/16/2023 | COT - RSEL - Electrical Final | Passed | ||
| 11/16/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |