Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
900 N CIRCLE D WY
Apply Date:
02/21/2023
Applicant:
GEORGE HOLGUIN
Description:
Stables Shade Port

Permit Reviews

Permit Number - TC-RES-0223-03008
Permit Status: Complete
Permit Description: Stables Shade Port
Start Date Submittal Complete Date Status  
03/20/2024 RESIDENTIAL NEW DWELLING v.1 03/20/2024 REQUIRES RESUBMIT Review Details
03/25/2024 RESIDENTIAL NEW DWELLING v.3 04/25/2024 APPROVED Review Details
11/20/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/22/2023 APPROVED Review Details
03/02/2023 RESIDENTIAL NEW DWELLING v.1 03/02/2023 REQUIRES RESUBMIT Review Details
03/06/2023 RESIDENTIAL NEW DWELLING v.2 03/24/2023 APPROVED Review Details
03/21/2024 RESIDENTIAL NEW DWELLING v.2 03/21/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0223-03008
Permit Status: Complete
Permit Description: Stables Shade Port
Date Description Comments
03/27/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.
11/22/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-03008
Permite Description: Stables Shade Port
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
12/27/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Canceled Inspected by S. Carrazco 12/26/23.
11/02/2023 COT - RSPL - Yard Water Line N/A Not Applicable
04/30/2024 RSME - Mechanical Progress N/A Not Applicable
08/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass Steel framing for Shade port.
11/02/2023 COT - RSEL - Electrical Underground N/A Partial Pass 11/2/23: 2 1/2" elect conduit from 200A panel on north side of new shade structure east and northeast to existing SES approved.
03/21/2024 COT - RSBU - Masonry Pregrout N/A Partial Pass Top out Tack room one.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-03008
Permit Description: Stables Shade Port
Total Completed Inspections - 14
Date Description Inspector Results Comments
05/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 5/22/23: all footings approved to pour
11/02/2023 RSEL - Electrical Progress Passed
03/05/2024 COT - RSBU - Preslab Passed
04/10/2024 COT - RSPL - Sewer Passed
04/22/2024 COT - RSBU - Roof Nailing Passed
04/22/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/25/2024 COT - RSPL - Yard Water Line Passed
04/30/2024 COT - RSBU - Stem Wall/Retaining Wall Passed Corrals
05/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/13/2024 BULD - Electrical Clearance Passed Approved 200A fussed panel in existing cabinet, INCR Clearance was called into TEP at 9:35am
07/25/2024 RSBU - Building Final Passed
12/30/2024 COT - RSEL - Electrical Underground Passed 12-30-24, per customer, this work order was finalized in July of 2024.
12/30/2024 COT - RSPL - Rough Soil Passed 12-30-24, per customer, this work order was finalized in July of 2024.
12/30/2024 COT - RSBU - Masonry Pregrout Passed 12-30-24, per customer, this work order was finalized in July of 2024.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1_1_PLAN_SET_V2_V1.PDF DOCUMENTS VIEW
REV1_1_NARRATIVE LETTER_V1_V1.PDF DOCUMENTS VIEW
REV1_1_STRUCTURAL_CALCULATIONS_STABLES_V2_V1.PDF DOCUMENTS VIEW
REV1_1_STRUCTURAL_SHOP DWGS_CALCULATIONS_STABLES_V2_V1.PDF DOCUMENTS VIEW
CM23-084 CIRCLE D SQUARED ADDITION TACK ROOM 1_V1.PDF DOCUMENTS VIEW
CM23-084 CIRCLE D SQUARED ADDITION TACK ROOM 2_V1.PDF DOCUMENTS VIEW
CM23-084 CIRCLE D SQUARED CALCS AZ_V1.PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20220927_113351_V1.PDF DOCUMENTS VIEW
FARTHING AFFIDAVIT DP22-0095_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_WILLDAN_PSA 2023_V1.PDF DOCUMENTS VIEW
2_PLAN_SET_V1.PDF DOCUMENTS VIEW
2_STRUCTURAL_CALCULATIONS_SHADE PORT_V1.PDF DOCUMENTS VIEW
2_STRUCTURAL_CALCULATIONS_STABLES_V1.PDF DOCUMENTS VIEW