Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1402 S TREAT AV
Address NEW:
1402 S TREAT AV
Apply Date:
02/17/2023
Applicant:
Daniel Simmons
Description:
Fire Damage Repairs

Permit Reviews

Permit Number - TC-RES-0223-02934
Permit Status: Complete
Permit Description: Fire Damage Repairs
Start Date Submittal Complete Date Status  
02/28/2023 RESIDENTIAL NEW DWELLING v.1 03/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0223-02934
Permit Status: Complete
Permit Description: Fire Damage Repairs
Date Description Comments
03/17/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-02934
Permite Description: Fire Damage Repairs
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/01/2023 BULD - Electrical Clearance N/A Partial Pass New electrical panel installed with proper grounding and bonding. Okay to provide temporary power for construction.
05/09/2023 COT - RSBU - Sustainability N/A Not Applicable
07/07/2023 COT - RSME - Mechanical Underground N/A Not Applicable
07/07/2023 COT - RSPL - Sewer N/A Not Applicable
07/07/2023 COT - RSPL - Yard Water Line N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-02934
Permit Description: Fire Damage Repairs
Total Completed Inspections - 12
Date Description Inspector Results Comments
05/01/2023 COT - RSEL - Grounding/Bonding Passed New electrical panel is properly grounded with 2-8' copper rods driven into the ground 6' apart.
05/01/2023 COT - RSPL - Gas Pressure Test Passed Gas lines are under pressure and holding 10# of compressed air. SWG Clearance provided.
05/01/2023 RSPL - Plumbing Progress Passed Plumbing rough-in is complete. Water is turned on.
05/09/2023 BULD - Electrical Clearance Passed
05/09/2023 COT - RSBU - Roof Nailing Passed
07/07/2023 RSBU - Building Final Passed
07/07/2023 COT - RSEL - Electrical Final Passed
07/07/2023 COT - RSME - Mechanical Final Passed
07/07/2023 COT - RSPL - Plumbing Final Passed
07/07/2023 COT - BULD - SWG Clearance Passed Approved 5/1/23 with gas pressure test, resend SWG Clearance
07/07/2023 COT - RSEL - Outdoor Lighting Passed
07/10/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7-10-23: Residential Intermediate passed 5/8/23 by Eardis.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV PLANS_V1.PDF DOCUMENTS VIEW
REV HVAC CALCS_V1.PDF DOCUMENTS VIEW