Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9350 E LEE ST
Address NEW:
9350 E LEE ST
Apply Date:
02/17/2023
Applicant:
Karin Barnes
Description:
SFR first submittal number T18CM05160

Permit Reviews

Permit Number - TC-RES-0223-02929
Permit Status: Complete
Permit Description: SFR first submittal number T18CM05160
Start Date Submittal Complete Date Status  
10/10/2024 RESIDENTIAL NEW DWELLING v.3 10/17/2024 REQUIRES RESUBMIT Review Details
01/28/2025 RESIDENTIAL NEW DWELLING v.4 02/04/2025 APPROVED Review Details
03/21/2023 RESIDENTIAL NEW DWELLING v.1 03/21/2023 REQUIRES RESUBMIT Review Details
09/19/2024 RESIDENTIAL NEW DWELLING v.2 10/10/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0223-02929
Permit Status: Complete
Permit Description: SFR first submittal number T18CM05160
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-02929
Permite Description: SFR first submittal number T18CM05160
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/21/2025 BULD - Electrical Clearance N/A Not Applicable 11/21/25: approved on T18CM05160
03/24/2025 RSBU - Building Final N/A Partial Pass Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-02929
Permit Description: SFR first submittal number T18CM05160
Total Completed Inspections - 15
Date Description Inspector Results Comments
11/21/2025 COT - RSEL - Grounding/Bonding Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSBU - Roof Nailing Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSBU - Interior Shear Bracing Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSME - Mechanical Final Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSBU - Preslab Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSPL - Yard Water Line Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSEL - Electrical Underground Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSPL - Plumbing Final Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSPL - Sewer Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSPL - Rough Soil Passed 11/21/25: approved on T18CM05160
11/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
11/21/2025 COT - RSEL - Electrical Final Passed 11/21/25: approved on T18CM05160
11/26/2025 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2025 0113_MCCANN RESIDENCE MAN SDJ CALCS_V1.PDF DOCUMENTS VIEW
CONS-CONS_MCCANN_2_V2.PDF DOCUMENTS VIEW
MCCANN RETAINING WALLS 1.16.2025- (1)_V1.PDF DOCUMENTS VIEW