Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/16/2023
Applicant:
Description:
Retaining Wall - Both sides of lot 117' L x 3' H Step down last 5' 110' L x 5' H Turn both back wall corners into 5' H

Permit Reviews

Permit Number - TC-RES-0223-02923
Permit Status: Complete
Permit Description: Retaining Wall - Both sides of lot 117' L x 3' H Step down last 5' 110' L x 5' H Turn both back wall corners into 5' H
Start Date Submittal Complete Date Status  
03/02/2023 RESIDENTIAL NEW DWELLING v.1 03/17/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0223-02923
Permit Description: Retaining Wall - Both sides of lot 117' L x 3' H Step down last 5' 110' L x 5' H Turn both back wall corners into 5' H
Total Completed Inspections - 6
Date Description Inspector Results Comments
01/08/2024 RSBU - Building Final Passed Retaining walls are properly laid. Okay to proceed with fencing.
04/23/2024 COT - RSBU - Masonry Pregrout Passed Nothing was Inspected by the Engineering Department on the walls during the Construction. We are Approving the Wall as it is being Inspected after Construction has been completed. The Engineer of Record or Developer should provide a Certification Letter for all walls that have been constructed at this time. Future Walls for all sites need to have Inspections Scheduled and Approved during the construction process from this date 4/22/24 forward.
04/22/2024 COT - RSBU - Stem Wall/Retaining Wall Passed Nothing was Inspected by the Engineering Department on the walls during the Construction. We are Approving the Wall as it is being Inspected after Construction has been completed. The Engineer of Record or Developer should provide a Certification Letter for all walls that have been constructed at this time. Future Walls for all sites need to have Inspections Scheduled and Approved during the construction process from this date 4/22/24 forward.
04/22/2024 RSBU - Building Progress Passed
04/22/2024 ENGR Engineering Final Passed Contractors caught in the wrong inspection need to be calling in for grading and rebar
04/22/2024 SITE - Zoning Final Passed Contractor is calling in the wrong inspection need to be calling in the inspection for grading and rebar

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-LOT220_V1.PDF DOCUMENTS VIEW
ENGINEERING PLANS_V1.PDF DOCUMENTS VIEW