Permit: TC-RES-0223-02768
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
236 E 23RD ST UNIT 1
Address NEW:
236 E 23RD ST UNIT 1
Apply Date:
02/09/2023
Applicant:
Bach Tran
Description:
Duplex
Permit Reviews
Permit Number - TC-RES-0223-02768
Permit Status: Complete
Permit Description: Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/16/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/14/2023 | APPROVED |
| 04/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/22/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0223-02768
Permit Status: Complete
Permit Description: Duplex
| Date | Description | Comments |
|---|---|---|
| 02/16/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
| 03/15/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 03/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-02768
Permite Description: Duplex
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2023 | PDSD Building Division - Unspecified Remote Video | N/A | Canceled | reference only |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-02768
Permit Description: Duplex
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/18/2023 | COT - RSBU - Preslab | Passed | ||
| 04/17/2023 | COT - RSPL - Rough Soil | Passed | ||
| 04/20/2023 | COT - RSBU - Roof Nailing | Passed | Ok to dry in roof system | |
| 04/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | Ok to insulate and Sheetrock walls | |
| 04/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to cover interior walls. | |
| 04/24/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/24/2023 | COT - RSPL - Yard Water Line | Passed | Domestic water line to main water line. Ok to cover progress area. | |
| 04/25/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved per JIM BURGE. 4/25/2023 | |
| 04/28/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Approved fire wall between units, okay to fire-tape and continue | |
| 04/28/2023 | BULD - Electrical Clearance | Passed | Approved Duplex service panels, please send ECO Clearance to TEP for units #A and #B | |
| 04/28/2023 | COT - RSPL - Sewer | Passed | Approved sewer line and HCS saddle connection to existing clay pipe main line, okay to shade cover progress areas | |
| 05/22/2023 | COT - RSEL - Electrical Final | Passed | ||
| 05/22/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 05/22/2023 | COT - RSME - Mechanical Final | Passed | ||
| 05/22/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/24/2023 | RSBU - Building Final | Passed |