Permit: TC-RES-0126-00337
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2026 E HANCOCK VISTA
Address NEW:
2026 E HANCOCK VISTA
Apply Date:
01/22/2026
Applicant:
David Hosking
Description:
REV_1, Electrical Equipment Revised; Battery-Only Solar Installation
Permit Reviews
Permit Number - TC-RES-0126-00337
Permit Status: Complete
Permit Description: REV_1, Electrical Equipment Revised; Battery-Only Solar Installation
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2026 | RESIDENTIAL SOLAR REVISION v.1 | 02/17/2026 | APPROVED |
| 01/23/2026 | RESIDENTIAL SOLAR v.1 | 01/29/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0126-00337
Permit Status: Complete
Permit Description: REV_1, Electrical Equipment Revised; Battery-Only Solar Installation
| Date | Description | Comments |
|---|---|---|
| 01/23/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0126-00337
Permite Description: REV_1, Electrical Equipment Revised; Battery-Only Solar Installation
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2026 | COT - RSOL - Electrical Final Solar Project | N/A | Canceled | Please make sure you have a surge protection device for the final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0126-00337
Permit Description: REV_1, Electrical Equipment Revised; Battery-Only Solar Installation
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2026 | BULD - Electrical Clearance | Passed | 5/8/26 TEP CLEARANCE: BAT |
|
| 05/08/2026 | COT - RSOL - Electrical Final Solar Project | Passed |