Permit: TC-RES-0126-00260
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4434 S WHITE PINE AV
Address NEW:
4434 S WHITE PINE AV
Apply Date:
01/19/2026
Applicant:
Brittney Neely
Description:
Installation of a 3.520 kW rooftop mounted photovoltaic system with battery storage system.
Permit Reviews
Permit Number - TC-RES-0126-00260
Permit Status: Complete
Permit Description: Installation of a 3.520 kW rooftop mounted photovoltaic system with battery storage system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2026 | RESIDENTIAL SOLAR v.1 | 01/29/2026 | REQUIRES RESUBMIT |
| 02/17/2026 | RESIDENTIAL SOLAR v.2 | 02/19/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0126-00260
Permit Status: Complete
Permit Description: Installation of a 3.520 kW rooftop mounted photovoltaic system with battery storage system.
| Date | Description | Comments |
|---|---|---|
| 01/21/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0126-00260
Permit Description: Installation of a 3.520 kW rooftop mounted photovoltaic system with battery storage system.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | BULD - Electrical Clearance | Passed | 04/02/2026 Approved clearance TEP DGC/DGL/BAT. |
|
| 04/02/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/02/2026 | RSBU - Building Final | Passed |