Permit: TC-RES-0126-00224
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4842 E 27TH ST
Address NEW:
4842 E 27TH ST
Apply Date:
01/16/2026
Applicant:
Inty Ops
Description:
Installation of a 11.50 kW (AC) PV System + Battery Integrated
Permit Reviews
Permit Number - TC-RES-0126-00224
Permit Status: Complete
Permit Description: Installation of a 11.50 kW (AC) PV System + Battery Integrated
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2026 | RESIDENTIAL SOLAR v.1 | 02/11/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0126-00224
Permit Status: Complete
Permit Description: Installation of a 11.50 kW (AC) PV System + Battery Integrated
| Date | Description | Comments |
|---|---|---|
| 01/16/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0126-00224
Permite Description: Installation of a 11.50 kW (AC) PV System + Battery Integrated
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2026 | BULD - Electrical Clearance | N/A | Partial Pass | 5.1.26 Approved for DGL verbal given at 9:50am |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0126-00224
Permit Description: Installation of a 11.50 kW (AC) PV System + Battery Integrated
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 05/07/2026 | RSBU - Building Final | Passed | ||
| 05/07/2026 | BULD - Electrical Clearance | Passed | 5/7/26 TEP CLEARANCE:DGC/BAT |