Permit: TC-RES-0126-00176
Permit Details
Status:
Needs Resubmittal
Type:
Residential Building - One or Two Family
Address:
3206 W TUMAMOC DR
Address NEW:
3206 W TUMAMOC DR
Apply Date:
01/13/2026
Applicant:
alex enoch
Description:
SFR with Garage
Permit Reviews
Permit Number - TC-RES-0126-00176
Permit Status: Needs resubmittal
Permit Description: SFR with Garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/14/2026 | RESIDENTIAL NEW DWELLING v.1 | 01/29/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0126-00176
Permit Status: Needs resubmittal
Permit Description: SFR with Garage
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/14/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
| 01/14/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 01/22/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 01/22/2026 | Manual J-D-S report |
| 01/22/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |