Permit: TC-RES-0126-00143
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7478 S CAMINO CARDAL
Address NEW:
7478 S CAMINO CARDAL
Apply Date:
01/12/2026
Applicant:
TFS Solar
Description:
Roof mount 6.60kW DC photovoltaic solar system; 15 modules, 1 Tesla 7.6kW Solar Inverter with 3 strings with hazard control devices. 40A PV breaker on 225A bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0126-00143
Permit Status: Complete
Permit Description: Roof mount 6.60kW DC photovoltaic solar system; 15 modules, 1 Tesla 7.6kW Solar Inverter with 3 strings with hazard control devices. 40A PV breaker on 225A bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/19/2026 | RESIDENTIAL SOLAR v.2 | 02/23/2026 | APPROVED |
| 01/12/2026 | RESIDENTIAL SOLAR v.1 | 02/11/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0126-00143
Permit Status: Complete
Permit Description: Roof mount 6.60kW DC photovoltaic solar system; 15 modules, 1 Tesla 7.6kW Solar Inverter with 3 strings with hazard control devices. 40A PV breaker on 225A bus with 200A MCB.
| Date | Description | Comments |
|---|---|---|
| 07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0126-00143
Permit Description: Roof mount 6.60kW DC photovoltaic solar system; 15 modules, 1 Tesla 7.6kW Solar Inverter with 3 strings with hazard control devices. 40A PV breaker on 225A bus with 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/01/2026 | BULD - Electrical Clearance | Passed | 04/01/2026 Approved clearance TEP DGC. Verified and received approved plans. |
|
| 04/01/2026 | RSBU - Building Final | Passed |